Rough-country 781 Bedienungsanleitung Seite 7

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 16
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 6
40. Loosen the stock brake line from the metal line on the frame rail shown using a 12 mm line wrench. A catch pan will
be needed to catch the brake fluid.
41. Remove the line from the frame rail using a 10mm socket. Next remove the brake line from the caliper and replace
the brake line with the supplied stainless steel lines and brackets. Reattach at the caliper using supplied crush
washers, tighten line and install the spring clip. After the install is complete the brae lines will have to be bleed.
42. For the front sway disconnects, assemble the supplied jam nut and end link on the sway bar link body. Adjust the
sway bar to approx 11” for a 4” & 6” kit measuring end to end. Tighten the end and jam nut using a 18mm wrench.
43. Install the new sway bar link on the factory sway bar as shown in Photo 22 with the supplied 12mm Flange lock nut
using a 16mm & 18mm wrench.
44. Install the new sway bar link on the sway bar bracket and swing up the assembly to the frame rail. See Photo 23.
Remove the sway bar link from the bracket while holding the bracket in place.
45. Mark the holes to be drilled and remove the bracket from the frame. See Photo 24.
46. Drill the two holes per side using a 17/64” drill bit. See Photo 25. Be sure to only drill through outside of the frame.
47. Install the frame bracket with the supplied 5/16” self tapping bolts (2 per bracket) using a 1/2” wrench. Photo 26.
48. Install the supplied mounting pin on the axle as shown in Photo 27. Use a punch or screw driver to hold the pin and
tighten using 19mm socket / wrench.
PHOTO 23 PHOTO 22
PHOTO 24 PHOTO 25
PHOTO 26 PHOTO 27
Seitenansicht 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 15 16

Kommentare zu diesen Handbüchern

Keine Kommentare